Scuola materna di Levate

Description

Costruzione nuova scuola materna a 6 sezioni

Location

Via Alcherio da Levate - Levate (BG)

Project

2006

Building

2007-2010

Amount

1.458.000 €

Customer

Comune di Levate

Principal architect

ARCHILOCO studio associato (Capogruppo) - arch. Germana Corradino

Structural project

REV Engineering srl

Plant designers

REV Engineering srl

Appointment

Integral design (architectural, structural, engineering, security), construction management, assistance to testing

Description

A school seen through the eyes of children, an articulated series of non-axial shapes, clad with a diversity of materials interacting in apparently random manner, generate spaces that make it easier to identify a place and the function it performs. A sequence of doorways leads to the entrance foyer, equipped with a multi-media teaching facility, which illustrates the energy savings of the building: solar thermal, photovoltaic and recovery systems. The coloured metal sculpture of the photovoltaic installation has been adopted as the building’s symbol.

Category

Share